» 2012 » January ¦ What You Can Get Away With

On writing

Something I forgot to mention last year was that I did complete NaNoWriMo again, though it was probably the most difficult time I’ve had of it in my four successes. This time I was a rebel in that I produced my 50,000 words in unconnected short stories rather than as a single novel. This was because I’d just finished an early draft of a novel and wanted to try out all the ideas that had sprung up in my head while I was writing that, ready to clear out my brain ready to go at the next draft.

(And don’t get too excited about me finishing a draft, as it’s still a really rough version and needs lots of work and a complete rewrite before anyone’s going to see it)

But the point of this post was to plug something else that arose from that. For the first time in my knowledge there were some NaNoWriMo write-ins here in Colchester (at 15 Queen Street) where a group of us got together to write, talk about writing, share experiences, drink tea and eat biscuits. As that was a positive experience for everyone who attended – and not just because of the biscuits – it was decided to carry them on as a regular thing and thus, Writenight was born. It’s a roughly fortnightly meeting taking place at 15 Queen Street, open to all and the first meeting of 2012 is tomorrow night. Why not come along if you want to know more?

For that very small subset of people who read this blog but don’t follow me on Facebook or Twitter, may I recommend the new Colchester Chronicle blog? It’s a ‘hyperlocal blog for Britain’s oldest recorded town’ run by Jason Cobb – who interviewed me last year – and looks like a good way to keep up with what’s happening across the town and borough.

, ,

Just to let people know that I’ve had notice from Essex County Council about roadworks that are going to be carried out on Westway (the A134) between the Balkerne Hill and Colne Bank roundabouts. These are some important safety works, centred around fitting in a proper barrier system on the central reservation, but they might cause delays while they’re happening.

They’re scheduled to start next Monday (the 9th January) – weather permitting – and will continue for about six weeks, though the work is only scheduled to take place during the day from 9.30am until 3.30pm, so it should hopefully not be causing delays during the rush hour.

,